NASA and Boeing revealed today that two newly discovered design issues involving Starliner’s parachutes and the tape used to protect the capsule’s wiring has forced it to cancel the planned June launch, with no firm new launch date scheduled.
The parachute issue involves the parachute cords, specifically the “soft link joints” that connect those lines to the capsule.
[Mark Nappi, Boeing’s Starliner VP] told reporters fabric links that join the parachutes to the lines of the spacecraft, called soft link joints, need to be replaced and possibly recertified to withstand heavier loads and stresses to ensure crew safety. “They were tested recently because of a discovery that we found during the review process where we believed that the data was recorded incorrectly,” Nappi said. “We tested (the soft links), and sure enough, they did fail at the lower limit.” [emphasis mine]
The tape — which has been found to be far more flammable than expected — is difficult to fix.
The second problem found last week is more extensive since the tape used to protect Starliner’s wiring harnesses from nicks or abrasions runs for hundreds of feet through several of the spacecraft’s internal systems. “There is a lot of tape on the wire harnesses,” Nappi said. “We’re looking at solutions that would provide for potentially another type of wrapping over the existing tape in the most vulnerable areas that reduces the risk of a fire hazard.”
That both of these issues were not fixed in development is beyond astonishing and speaks so badly of Boeing’s engineering and management that it is difficult to find words…..
This post was created with our nice and easy submission form. Create your post!
Comments
Loading…